Respuestas al mensaje #24

  • 🇵🇦 Nuestro primer dominio localizado está en español en kiwifarms.pa. Our first localized domain is on Spanish on kiwifarms.pa.
Goofy Logic

Japan bullet train driver leaves controls for bathroom break as train speeds at 150 km/h with 160 aboard

The Tumbler Ridge line was finished in 1989 at the cost of $2.5 billion. Ten years later BC Rail was "leased" to CN Rail because the BC...
Snekposter

Japan bullet train driver leaves controls for bathroom break as train speeds at 150 km/h with 160 aboard

I suggest you take a look at how California's high speed rail attempts have gone. Well, I'm not sure if it was multiple attempts or just the same...
ColtWalker1847

Japan bullet train driver leaves controls for bathroom break as train speeds at 150 km/h with 160 aboard

Air travel. Trains are for faggots, communists, and Europeans. I repeat myself. Oh and freight. Which is where it SHINES and the US is the world...
Atrás
Top Abajo