Guys, we need to get this on President Trumps desk ASAP its unacceptable
Markiplyer apparently FAKED his FNAF 10/20 run
also slightly more on topic is that the US has cancelled yet another frigate-class ship and yet again reveals we may have just forgotten how to design and build ships at scale
this guy has the best comment ive seen on it
How many billion dollar ship designs can you fuck up to the point of cancellation before there are some serious financial repercussions?
How many people had to work their whole lives to pay taxes for ships that never got built? You get my meaning? It takes alot of people alot of work to create just 1 billion dallars worth of taxable value, how many times can you waste that before you run into some real probelms?
Ive heard that when the navy isent late, lost or lacking they are more than likley running the ship aground or crashing it but this is the first ive heard of them just plum forgetting how to make the ships?
Our strategic bomber fleet is made up 70-80% of b-52s that the last one that came off the assembly line was in the 62'
Our navy is made up primarily of Arleigh Burke class destroyers, a capable ship sure, but it was first designed in the dang 80s
you realize the men who made these designs are either retired or dead now and those replacing them only know how to maintain and upgrade systems OTHERS designed and built, its 2 totally different skill sets.
we made 21 b-2s and THREE crashed
we made just about 750 b-52s and they have "crashed" 75 times in their over 75 year service history, and is still the backbone of our strategic bomber fleet with the b-2 already being retired all while serving in real wars not just conflicts.
BTW just as a little sweetner, it cost LESS to build 744 b-52s than it cost us to make 1 SINGLE b-2, this should make you sick to your stomach
ITS TWICE AS EXPENSIVE FOR A SINGLE RETIRED OR CRASHED B-2 THAN THE
ENTIRETY OF DESIGNING AND BUILDING HUNDREDS OF STRATOFORTRESSES A PLANE STILL FLYING TODAY.
BTW im not retarted I know they still fly the b-2 thats not what "retireing" them means, it means they already have moved onto a new airframe, the b21, as it was deemed the b-2 was unsustainable to manufacture. The airframe PRODUCTION is retired.